Miko Shelter Solutions have over 25 years experience in design and manufacturing. Miko uses the latest CAD Design systems and CNC equipment to produce shelters (cycle, compounds, waiting shelters) to the highest standards possible.
Our own tradesmen produce all of our products and we install all of our systems throughout the UK as well as carrying out our own groundworks. No subcontractors means our costs are kept to a minimum, ensuring the best possible service at the best possible price.
All our shelters are produced to BS5950 (Structural Use of Steel in Buildings)
Finishes available from Miko Shelter Solutions
Polyester Powder CoatedSteelwork undergoes three stages of pre-treatment then the paint is baked onto the steel between 200 - 210 oC. This provides a highly durable finish in almost any colour you need. |
Hot Dipped Galvanised to BS EN ISO 1461-1999Providing the best possible finish for exterior steelwork. Galvanising is ideal for extreme weather conditions. It should be noted that we can also use both methods to protect steel giving the ultimate protection finish. |










