Oxbridge Primary School

bullet point
Client: Oxbridge Primary School
bullet point
Location: Stockton
bullet point
Specification of Work: Playground Canopies
bullet point
Value: £14,810
bullet point
Project Length: 4 weeks

Get A Quote for Playground Canopies

Introduction

Miko were called in by the Head Teacher at Oxbridge Primary School, on Teesside, to solve a problem. Mrs Sue Moffitt had been told by another canopy company there was nothing they could do to provide her with a Parent Waiting Canopy which would also double up as an outdoor teaching area.

Completed Look

Mental covered walkway

Project Brief / Background

This was the area at Oxbridge before Miko designed and installed the canopy. It was simply another area of the playground but was used by the parents as the main pick up point for their children.

What Was Done

Miko’s engineers were able to not only provide a canopy which measured 10m x 7.5m but were also able to delight Mrs Moffitt with a solution which not only provided a large canopy within her school yard but also one which looked great with its multi-coloured powder coated finish.

 

The canopy not only gives protection from the rain but also the sun, with its anit UV cladding. There is now a fantastic area for the children to work and play in, whatever the weather, as well as an area for up to 60 parents to wait away from the elements.