Holmwood School

bullet point
Client: Holmwood School
bullet point
Location: Middlesbrough
bullet point
Specification of Work: Playground Canopies
bullet point
Value: £19,354
bullet point
Project Length: 4 weeks

Get A Quote for Playground Canopies

Introduction

Miko Engineering undertook this project for Gus Robinson Construction. Holmwood School required a larger play area but wanted something that would work in the winter and summer months.

Completed Look

school canopy

What Was Done

The canopy provided a sheltered area for the children to play in and it also has good access to the outdoor play area. The canopy measured 6.5 m by 4.5 m by 4 m high and gave a large amount of space for the school to have a range of different play stations for the children.

 

If you or your business is looking for shelter solutions then please email Miko Engineering sales@mikoengineering.co.uk.